When we got back from vacation we stopped by the house to see how things are going. It is looking great! The concrete is poured inside and all the insulation is up. The drywall is ready to be hung as soon as we have our walk through with the builder. Things are still on schedule to be done mid-November!!

Our walk in closet and sitting room (tons of room - can't wait!)

Master bedroom with all the drywall supplies ready for use.

I also grabbed a shot of the master bath tub. It's been in a while, but I never had the camera with me.

One side of the basement showing the poured floor, the fancy water system and the bathroom rough-ins.